Asbestos Environmental Solutions Ltd

Insulating board removal

Asbestos insulating board, or AIB, was used extensively in UK buildings until the late 1980s for its strength, fire resistance and insulation. It can contain a substantial amount of asbestos and it is fragile, so it is classed as a higher-risk material.

In most cases AIB removal is licensed work. It needs a contractor licensed by the HSE, advance notification, a sealed enclosure, decontamination facilities and an independent clearance check at the end.

Insulating board removal carried out on site

Where AIB turns up

  • Ceiling tiles and partition walls
  • Soffits, fascias and porch panels
  • Boiler and cupboard linings
  • Fire doors, fire breaks and service ducts
  • Behind walls and above suspended ceilings

You cannot identify AIB by eye

AIB looks very similar to modern boards and some cement products. Age is a clue, because it was common until 1985 and used into the 1990s, but only a laboratory result is reliable. We do not start AIB work without one.

Reinstatement

Once the area has been certified clean, we can put things back together: replacement boards, plastering, ceilings and decoration, through our own team or trusted partners.

Insulating board removal on site, second photo

How we do the work

  1. Plan and notify

    A detailed plan of work is prepared and the job is notified to the HSE before licensed work begins.

  2. Build the enclosure

    An airtight enclosure is built around the area, fitted with air locks and a negative pressure unit that filters extracted air through HEPA filters.

  3. Set up decontamination

    A three-stage decontamination unit gives the team a controlled place to shower and change.

  4. Remove by hand

    Boards are wetted and removed with hand tools, intact where possible. Power tools are avoided.

  5. Clean and bag

    Surfaces are vacuumed with HEPA equipment and wet-wiped, and waste is double-bagged and sealed.

  6. Test and certify

    An independent analyst carries out a visual inspection and air testing before issuing a certificate for reoccupation.

Asbestos waste is double-bagged, sealed and taken by a registered carrier to an authorised disposal site. You receive a waste consignment note as your legal record.

Questions about insulating board removal

Is AIB removal always licensed?

Usually. Some short-duration jobs can fall below the licensing threshold, but we confirm the classification before we quote.

Can other trades work nearby?

That depends on how the enclosure is built and what the other trades are doing. We agree this with your project manager beforehand.

Can I get back into the room straight away?

Once the work is complete and, for licensed jobs, the clearance certificate is issued.

Do I need a site visit?

Usually, because enclosures are built to fit the space. If you cannot arrange one, we may be able to give a desktop estimate from photos and plans.

Ready to talk about your site?

Share the location and a few details, and we will confirm the scope and the next step.

Or call +44 7939 897899 or email asbestossoultionsltd@yahoo.com